Pages

Showing posts with label operations. Show all posts
Showing posts with label operations. Show all posts

6.23.2014

a grand day out

A visitor came to call from far away, a friend of Pierre Oliver's.

I zipped in to the top end of town and took the subway south. It was one of the new Bombardier-built trains without bulkheads. Going around curves can be a bit disconcerting, but the equipment seems well made and the ride is smooth. A big difference from the old British-made equipment I remember travelling on many (many?) years ago.


Pierre's friend Thorsten is a Fremo modeller from Germany who is also planning a US style layout in a rare European basement. Pierre went to a big Fremo meet in Nordhorn back in 2009 and wrote extensive commentary in his own blog.

If you don't know what Fremo is, you should look into it. Their organisation, display, and operation of massive modular layouts puts most of the public efforts I've seen here to shame.

As an aside, Pierre happens to be the proprietor of Elgin Car Shops and makes some of the finest resin rolling stock kits you'll ever see. Crisp and clean castings, fine etched frets, and clear instructions.

We all gathered at Trevor Marshall's Port Rowan layout for an op session. Initially, I played the dual roles of Fat Brakeman and Confused Conductor while Thorsten operated the locomotive. Trevor had added yet another refinement to the paperwork which, of course, threw me off for no good reason.














Later, he performed the conducting duties while Pierre ran an extra. Frankly, Thorsten did a better job than I did despite never having seen the layout or paperwork before. I'd better pull up my socks!

Thorsten had brought along some of the new leg brackets being made for Fremo modules. They seem to be galvanised steel, water-jet cut and stamped, with a swaged threaded insert for an M8 thumbscrew. Very nicely made. These take a square aluminium tube or wooden leg and offer a slight amount of adjustment for height via the thumbscrew. It shows what can be done by a focused group of builders looking for good engineering solutions.

After the trains were all safely back on the sector plate, we dropped in at Harbord House for a meal and refreshment. Long and enjoyable  discussions of trains, both real and model, followed.

A quick run up the subway brought me back out of the core and homeward.

11.08.2012

boxed in

I was able to kill two birds with one stone recently by combining wood working with model railroading; but not building a piece of rolling stock or a structure, or even the benchwork supporting the track.

Just knocking together a couple of boxes...

My friend Trevor Marshall wanted to add the use of waybills to the operating sessions on his S scale "Port Rowan" layout. Many operations-oriented modellers use cut-down representations of prototypical railroad forms - often stuck in little Masonite pockets on the front of their layout fascia. Trevor, however, didn't want to adopt this methodology. He was after something more realistic in appearance to hold his paperwork.

After evaluating several pictures of real waybill boxes, he eventually stated a preference for the Southern Pacific style. Based on the visual aesthetic, I had to agree.

 one basic shell and the start of the second
The real boxes are made of plywood and are quite tall, but the Port Rowan layout fascia would not allow a full sized box to be attached without intruding into the scene. I scaled down the box while trying to retain the functionality.

I needed to reduce the size of the materials to effectively reduce the size of box, but they still had to be robust. Sections of 1/2" and 1/4" poplar were used to create the box, with cast brass hinges & hasps from Lee Valley Tools replacing the (likely) zinc-plated steel hardware of the original.



heavy duty hardware

Brass #8 and #4 fasteners were obtained to attach the hardware; they really should all be slot-head to match the era. The hasp screws may yet get replaced if I can locate a handy source.

Overall dimensions are 2"d x 5-3/4"w x 8"h. A forward-tilting lid (not shown here) is 7"w x 3"d and 1/2" thick. The 1/4" thick front flap is taking on a bit of a bow in an obvious effort to "weather itself".

You can see the prototype inspiration at Tony Thompson's SP blog entry about their own waybill boxes. Trevor has already created a blog post about the installation of these two items on his layout, with links to (much better) pictures of the finished product.


9.08.2005

outside the enginehouse


Sonjora Branch of the D&RGW.

A small scene in the Rio yard of Dave Burrough's fabulous layout. Car card operations on this pike are enhanced by flawless mechanical operation, a PFM sound system, and hands-free switching thanks to Kadee magnetics throughout.

9.07.2005

operations

This week and next I will be participating in four operating sessions on a variety of local layouts ranging in timeframe from early to late 20th century. Some will be signalled and others will be train order and/or timetable with car cards. All will have multi-person crews for each function (at least engineer + conductor/brakeman).

The lure of operations over simply "running trains" is sometimes difficult to convey. Modelling a feasible (or actual) rail system and it's purposeful movement of goods can present significant challenges unless the layout is designed from the start to support this activity. In the end, I feel it adds measurably to the overall enjoyment of the equipment and layout.