
One end of the 3-section module currently under construction for
the S Scale Workshop.

The other send of the set. It is a 9'-9" long S curve with minimum 52" radii joined with easements. One #8 turnout will lead to a sugar-beet loading facility. The primary route is through the diverging leg of the turnout.
No comments:
Post a Comment