Pages

Showing posts with label repair. Show all posts
Showing posts with label repair. Show all posts

2.01.2013

timing is everything

Lots of stuff going on lately.

Model Railroadish stuff, mostly.

A trip to the Amherst Railway Society's big train show in Springfield, MA offer ample chance to blow one's mind with possibilities. Add to that a heaping goodie basket of new things from the various vendors...

Travelling with local traction modeller extraordinaire Roger Chrysler was a real treat; I'd be more than happy to repeat the process for any train show I can think of.

However, unexpectedly, I had to debug the S Scale Workshop's layout on Friday afternoon. Due to time constraints, I was attending the show for Saturday only, and had not anticipated being able to enter the show grounds ahead of time. Through sheer luck & good timing I was in the same building as the layout late in their setup phase. Workshop member Andy Malette of MLW Services spotted me while I chatted with Jeff Adam of Motrak Models. Andy hauled me back to the layout to see what was going on.

The DCC system was giving the group fits. I found several things wrong over the course of the next hour or so:


  • three custom made, twisted-pair (Cat5?) LocoNet cables were causing the throttle buss to spasm
  • one LocoNet UP5 panel was not daisy-chained correctly
  • a rail gap had closed up at one turnout, shorting the track buss
  • a damaged Tortoise had been replaced but the frog power routing had been compromised, shorting the track buss when the points were aligned for the main.


The first three issues were isolated and sorted out fairly quickly by halving the layout's busses until the faults revealed themselves. The last item could not be readily repaired as that Tortoise is part of a complex control panel comprised of momentary pushbuttons and LED route indicators that doesn't lend itself to tracing wires unless that module set is laying on its side; which was not practical at that point in the setup.

One issue I should have dealt with was to ensure that the Command Station was centrally located along the track buss. The layout was about 80' in length this time around thanks to some excellent new modules built by member John Johnston. Our habit has been to hook the Command Station into the buss about 8' from one end. Not such a big deal when the layout is in the 40-50' range, but it gets much worse as track buss lengthens. Next time...

In the end, the layout was operational for the weekend. I was able to come back on Saturday after lunch and, while the rest of the crew ran trains, chat with the general public and other modellers who viewed the modelled scenes and trains. Some great questions were asked and many compliments were made.

It came as a pretty big surprise to the crew when the Amherst Railway Society's committee stopped by at about 4 PM and awarded us "Best in Show - Layouts" for 2013. We are certainly honoured to be recognised in this manner. Needless to say, spirits were running high for the rest of the weekend.


11.24.2012

smooth moves

Recently I was helping my dad wire up a 2-track staging yard for his O-16.5, Welsh inspired portable layout. Dad already had the yard built and attached, so I just packed up my VOM and other electrically necessary tools for the job. The wiring itself was easy.

The staging yard is a removable shelf that attaches to the back of the quarry section of the layout. Trains enter and leave the sceniced portion through a hole in the backdrop.

The intent is to be able to park a couple of short trains off scene, and selectively power one track or the other. The layout is controlled with a Stapleton walkaround DC throttle so a simple on-off-on toggle did the trick in the new yard. A flying lead equipped with Anderson PowerPole connectors brought power from the quarry section.

The entrance to the yard was via a curve ladi across the edge joint and, due to some dimensional assumptions, there was a short slope from the backdrop down into the yard tracks. The included 18" radius section lead directly into the point end of a Peco insulfrog turnout.

And this is where the trouble all started.

One section of rail at the frog end of the "previously enjoyed and slightly shortened" Peco turnout had an intermittent electrical connection. In addition, the points are powered from their adjacent stock rails via small wipers attached to the base of the point rails. As a loco was moving across the turnout, slight shifting of the components made the electrical contact fail unpredictably causing jerky motion or stalling.

I was performing my functional tests with an HO P2K SW 4-axle diesel that (normally) runs beautifully. However, dad only uses 0-4-2 Bachmann and Peco/Branchline locos on the layout. When placed in service they wouldn't make it across the turnout without constant poking and prodding. A bigger issue turned out to be the track geometry itself. The short slope at the backdrop caused the cab end 2-wheel truck on the Bachmann locos to drop down and leave the track entirely, and the curve leading into the shortened point-end of the turnout caused the loco wheels to pick the point tips and derail.


While the equalised chassis of the Peco/Branchlines 0-4-2 engine managed the distance better than the rigid frame Bachmann "Anglacised" On30 Porters, the consistency of operation was not sufficiently high. Something had to be done.

After much filing and adjusting, Dad & I came to the decision to alter the brackets holding the yard shelf to eliminate the slope. He then tore up the track to improve the flow by inserting a short straight section just before the points. The turnout itself will be replaced by a live-frog version so that the short wheelbase locos can enjoy fewer interruptions in electrical pickup.


I'm still waiting to hear if the planned corrections have eliminated all of the problems. The physical distance between our homes makes it difficult to collaborate effectively.

Lessons:

  • avoid sharp transitions in vertical and horizontal planes
  • avoid curves leading into point end of turnout
  • use guard rails where necessary
  • ensure close fitting joints on curves

11.10.2012

this plane is grounded

I finally took the time to start refurbishing the Stanley "Handyman" H1204 plane I picked up a short while ago. It's supposed to be a present for my brother-in-law (as far as I know he doesn't read this blog).
as found...

Disassembly was easy; there simply aren't that many parts. As I expected, the bed and frog castings were heavily painted, so neither the bed-to-frog nor frog-to-iron matings were actually solid.

I trued the sole of the plane and cleaned up its sides using medium and fine emery papers laid on my surface plate. The mouth is in decent shape; I don't want to open it. The mating surfaces of the bed and frog had all of the paint cleaned off with my least important single-cut file.

in pieces...
I took a cabinet scraper to the tote and knob, removing a cracked, nasty, shiny black paint. I'll still need to sand these handles before I refinish them with a Minwax stain.

The tip of the cap iron was cleaned up and flattened where it will contact the iron. The iron was then sharpened using my DMT red/blue and 5000 grit ceramic "stones". I picked these up at the now defunct Bingeman's Wood Show in Kitchener a year or so ago and they are working well for me. A bit of camber was added to prevent the iron's corners digging in on wide boards.

Reassembly of the components was straightforward, BUT...

I now understand why the plane was sitting forlornly (yet not too bad looking) at the antique barn. No matter how I adjust the frog, I cannot get the iron to square up with the bed; the left edge remains out of contact unless the adjustment lever is set over to nearly its limit. I assume that the previous owner(s) had little luck using it for any but the most basic planing tasks; there was no evidence of adjustment of the frog at any point in its life so I can only assume this is how it left the factory..

The iron has been re-ground dead square on the Delta grinder + Lee Valley grinding rest combo; there were some massive nicks at the edge. The mouth opening is squarely located on the sole.

back together but not ready for prime-time
The only solution that presents itself is to accurately mill the mating surfaces of the bed (fairly easy) and the frog (more difficult) to guarantee the iron's alignment. The next task will have to be (finally) setting up the Taig mill which has been is mothballs since before the move.

I think this is a good thing.



11.12.2011

too bad, so sad,

bye bye.

The newbie's hand-me-down layout was not worth saving. It was a 5'x9' Granite Gorge & Northern from Altas' old "6 HO Railroads You Can Build"

When it was prepped for storage or moving, almost all of the wiring was torn out from underneath, the control panel was disconnected (cable cut) and the many bridges across the middle joint were very roughly removed. In the process, several sections of cork and track were damaged. The track was a mix of brass and nickel-silver; likewise the turnouts were from various manufacturers, in various states of repair.

I wasn't confident that this could be repaired easily. I knew the fellow was eager to run some trains, and it would be many hours of work for a newcomer to get this thing back in decent shape (if it could be saved at all). Frustration could set in very quickly, and I wanted to avoid yet another bad experience for a beginner.

Based on our discussion of what he was interested in (and his skill level), my recommendation was to scrap the top and replace it with a flat deck. Then obtain a starter set of either Kato Unitrack or Bachmann EZ-Track, a Bachmann Berkshire with DCC, and an NCE Powercab.

I found out that the local hobby shop had a single Kato World's Greatest Hobby starter track plan set left in stock and suggested that purchase to him. It was still in the shop on Friday, so I'm not sure where he's at with his activities.

9.25.2011

up 'n running

Dad had converted an On30 Bachmann 0-4-2 to a more British looking engine using a number of 1:43 Bagnall components from KeyKits in the UK (now sadly closed). He followed the general process outlined on Brian Fayle's website for the conversion itself.

The Bachmann porter has a number of features that make it a desirable engine, but also some that make it a royal pain in the posterior. One of the worst aspects is the close clearance of the rods to the cab structure. Over time the motion has become sloppier, resulting in reduction of free space between the moving and non-moving parts.



Finally, the engine just stopped moving, but the motor kept running. Essentially, because of the rod ends constant banging into the underside of the cab floor, the wheels got so badly out of quarter that the siderods jammed up and the drive gear on the axle spun. Not a good situation.

After a suitable period of squinty-eyed consideration, I was able to requarter and regauge the wheels, add a drop of CA to the ends of each axle, and grind a pair of clearance slots into the underside of the cab floor above the left and right rod ends. Reassembly yielded no unexpected spare parts and the engine actually runs better than it did when new, as there is no longer even a slight drag of the rods on the structure.

4.02.2010

light work

Imagine my horror when I took the module set to the most recent exhibition, only to discover that the scenic work I'd done was completely the wrong colour under proper lighting conditions. So much for 'making do' with what I had.

Installation of two single fluorescent fixtures, equipped with daylight tubes, over the modelling bench in the shop has revealed exactly what I suspected; namely, that it's a miserable dark pit. I'll need at least one more single fixture to provide ambient light just for the bench area.

The daylight tubes certainly render much better colour than the mishmash of incandescent bulbs which were in the track lighting that I tore out. In addition to the overheads, there are two daylight incandescent swing arm lamps pointed directly at the bench's work surface which are the all-important task lighting part of the equation. There's no sense in mixing colours from the various bulbs in the shop itself so I'm trying to install all 'daylight' sources regardless of fixture.

A tawdry chandelier (? = don't ask) still has to be removed, and three or four more fluorescent fixtures will have to be installed to provide ambient light the lathe & mill end of the shop. Proper task lighting will still have to be situated at each tool to brighten the jobs at hand.

It may seem like a lot of bother to swap out light fixtures and add a bunch of goose-neck or swing arm lamps but, in the end, if you can't see what you're doing the jobs will be that much harder to complete.

10.26.2008

domestic break

Just bought a nice, 15 light French door at the local "Re-Store" to use in one of the bedrooms of the condo. The door's surface has quite a lot of dent and scratch damage caused by mis-handling during salvage, but all of the glass is intact. Since the door will be painted, these cosmetic flaws are unimportant.

I was able, with the aid of a long metal straight edge and circular saw equipped with a planing blade, to cut 1/8" off each edge of the door to get it to fit into the existing door frame. This allowed for fresh dados to accomodate the hinges and kept everything nice and symmetrical. A quick trim of the top and bottom of the door completed the re-sizing.

The only major stumbling block is the height of the passage set. The position of the new door handle is lower than the existing door frame location. The door frames in the condo are one-piece metal assemblies. The strike plate location is fixed and cannot be moved up or down without a great amount of grinding, welding, and cursing.

The easiest solution is to raise the handle position in the door. Using a trepanning cutter in the drill press, I produced a number of pine slugs to fill in the existing holes. These have been glued and clamped into the body of the door, then shaved flush with a broad chisel. Using an appropriate hole saw and spade bit, I will re-drill the door at the new passage set location. Any remaining voids, dents, and scratches in the door will be filled with wood putty, sanded, and primed.

10.20.2008

portly porter problem?

Dad purchased a Bachmann On30 porter (0-4-2) to use on his proposed 7mmNG, Welsh quarry inspired portable layout. From KeyKits in the UK, we obtained suitable Anglicising pieces (Wrightlines W996 cab kit and W963 chimney). The conversion itself was prompted by Brian Fayle's 7mm micro-layout workhorse and other examples from his website. The Bachmann chassis is a known "good runner" so we anticipate good service.

It did run well right out of the box, however, once the whitemetal cab pieces were substituted for the plastic details, the ends of the siderods started banging into the underside of the cab floor. "Too much weight!" was the initial thought but, upon partial disassembly, it was observed that one of the rear axle U-grooves in the plastic frame was deeper than the other. This caused the rear axle to tip out of true with respect to the front axle and the engine developed a list to one side.

This tilt caused the engineer's side of the cab floor to interfere with the siderod motion. ACC'ing a ~.015" thick pad of shim brass at the bearing surface of the over-deep U-groove solved the problem. Now the engine sits level on its axles and travels without any apparent binding.

The new cab assembly is secured to the stock footplate with flat head 1-72 machine screws countersunk into the underside of the floor. A stemwinder brake stand has been added to the footplate. The Bachmann steam dome needs to be removed from the saddle tank, and a simplified water fill hatch needs to be fabricated. The engine can then be painted and lined for service.

10.16.2008

more dip than a cocktail party

Well, not anymore. With judicious assistance, I finally managed to remove the pronounced dip at one end of the S scale module. Several possible approaches were considered before undertaking the work.
1) lever the extruded styrofoam "bedrock" up from below <- brute force and stupidity
2) hack into the structure sideways at the base of the ballast slope and jam in some shim material <- messy and imprecise
3) strip the rail off the affected area, stack new ties on top of the old, and carefully sand level. <- least destructive and easiest to verify results.

Ultimately choice #3 was pursued. About 2'4" of rail was removed and new sugar-pine ties were glued on with full strength Weld Bond adhesive to fill the depressed area. The opportunity was taken to re-align the rails slightly to eliminate a drunken wander in the main line. 50 grit paper was Super 77 spray adhered to one side of a 4" wide, 2' long, flat plank. 150 grit paper was likewise stuck to the other side of the plank.

The glue was allowed a long cure time before the ties were attacked with the 50 grit until nearly down to the original tie height at both ends. Sanding strokes were made perpendicular to the right-of-way to limit stress on the small gluing surface areas. Frequent checks were made to ensure that the new ties were not getting a crown or being tapered towards one side or the other. Once the old tie colour started to show through the thin skin left by the new ties at the extreme ends of the fill area the 150 grit side was used to clean up and de-fuzz the surfaces.



You can see how pronounced the dip was close to the module end by the rapid increase in fill-in tie thickness. Next the ties were stained with Floquil's "Tie Brown". What remains is the careful replacement of the rails to ensure they meet up with the previously marked positions at the end of the module, and the re-application of ballast around the new ties. A quick trip under the module with a soldering iron will re-attach the buss feeders, and re-testing will be done well in advance of the Christmas Train Show.

Why did the dip appear? Based on the sunken appearance of the ballast along the centreline of the ROW, I can only assume that the eye-dropper application of thinned adhesive was too agressive and the Tentest subroaded contracted as it dried up. This pulled the cork and ties downwards immediately after the end of the trapezoidal pine profile block at the end of the module (which remained flat & level).

Near the siding end of the split-rail fence, a copse of evergreens has sprung up. Short lengths of styrene tubing have been glued into the foam base to ensure rapid installation and removal of the trees for transport. There are twelve MountainView Depot conifers which are a far better looking and more consistently produced than anything I can manufacture.

Here's a product shot from the MountainView Depot gallery:



I'll need more of these, in various sizes, to add depth and texture to the rest of the module. In addition, a good number of flowering shrubs and low scrub will have to be applied to balance the scene.

1.05.2008

pressing business

I took apart an HO Model Die Casting 4-4-0 that was waddling down the track. Using a collet chuck and a DTI I was able to determine that the factory bored axle hole in one of the metal hubs was ~ .020" off centre.

I turned a cavity into a piece of 1" diameter steel rod stock chucked in the 3-jaw to form a cup chuck that the tyre rim would sit in without play. Loctite was used to hold the wheel firmly in place. I braced the wheel hub with the nose of the tailstock drill chuck overnight so it wouldn't shift while the Loctite cured.


Using a tiny endmill, I bored a new axle hole of larger diameter in the true centre of the wheel.


I then created a brass bushing to fill the gap between the larger hole and the existing shaft diameters from a length of brass rod held in an ER16 collet.


With my miniature arbour press (see previous post) I was easily able to fit the bush to the axle and the bushed axle into the newly bored wheel.

Checking with the DTI on the tyre rim I found the eccentricity to now be ~ .003", which was equal or slightly better than the remaining "stock" wheel measurements.

The locomotive no longer waddles but it does suffer from poor traction due to its rigid, uncompensated chassis design, light weight, and small motor. Unfortunately the driving axle is the forward one, which precludes any easy changes to the suspension which would improve operation.

5.02.2005

current project (part 1)

When I can manage to get the link up and running, I will have a honey of a Current Project to share. It's a devilish little 0-4-0 infernal combustion loco kit that has seen better days. At some point it might have been an adequate runner, but that is not longer the case.



The motor and gearbox design would be fine if the whitemetal castings hadn't worn away around the axles. Now the gears do not stay in mesh. When they do decide to connect, it jumps and bucks like a startled deer. There is no slow speed control due to the negligable reduction in RPM through the use of a terribly small diameter worm wheel. Slow speed running will have to be addressed during the rebuild.

I have an idea that will increase the gear ratio, provide a 3-point suspension, and permit the addition of a small flywheel. This will involve a complete chassis fabrication, but it will be well worth the effort in terms of performance and reliability. Further bulletins as events warrant.