Pages

2.23.2010

absence

Not a lot of posts lately; too busy with a variety of domestic tasks.

The workshop has languished largely unused. Recreational project progress is virtually non-existent.

However, a certain amount of work was accomplished in preparation for the 2010 Copetown Train Show. The fact that the module carrier I had devised did not fit through the back door of the new house necessitated a rebuild of the unit to permit movement in to and out of safe storage. This was accomplished using scraps of material saved from other fabrication jobs. The three-section module is now handled in two carriers, each of which are manageable by a single person.

Also, in preparation for the show, a mock-up of the sugar beet loader was made using Mt. Albert strip wood and a slightly modified O scale "Red Devil" coal loader. A liberal amount of artistic license was exercised in the creation of the basic structure, primarily due to space restrictions on the module base.



In spite of a tight fit, the loader gives a suitable impression of the method of loading the rail cars for shipment to a processing facility. It is a shame that the local sugar beet industry essentially died out in the late 50's.

8.14.2009

and, speaking of print...



Peter Jones' book, Building Small Steam Locomotives, has a title that means what it says. The book reviews the nomenclature, planning, and process of building your own steam loco, either from commercial components or from raw materials. While no specific plans are printed within the covers, you are given just enough information to help locate all the bits & pieces (including drawings) to begin construction.

eMedia

It's difficult to accurately categorise the newest generation of online "publications" as direct replacements or even competition for traditional magazines. They exceed the capabilities and features that mere paper can offer. As such, they may not replace the old ways very quickly or completely.

Both Model Railroad Hobbyist and The Modeler's Guild (sic) offer a familiar format of articles, reviews and photos but also provide streaming video, user conversation/interaction, and reader feedback options not possible following the print paradigm.

7.30.2009

one corner of the promised land



That is to say, land that I was promised. Finally, the workspace begins to take shape. A little more elbow room and a little less worry about dropping pointed, heavy, or glue-covered stuff on the floor.

More bins will have to be added to hold detail parts, and a rack will be made to hold both wood & styrene strip. Currently envisioned is a set of 12" long plastic tubes (2.5" or 3" diameter) arranged in a "wine-bottle" style matrix.

One issue that needed immediate resolution was that of humidity. Having noted rust on several steel surfaces, purchase of a decent humidifier with a continuous drain occurred forthwith.

Still outstanding are a powered vent for solder/paint fumes, and flat storage for sheet goods & drawings. Existing ceiling lights really need to be replaced with something that actually illuminates; the camera flash is deceptive.

5.24.2009

to thine own self...

Solid reference material like this article on Byron Henderson's blog, will get most people moving down the right track in terms of their own layout planning. Note: make sure you follow along to the subsequent parts of the article series to get full benefit of the material; it's well worth the time invested in reading it.

Having spoken to a number of people (of various experience levels) about their layout plans, I've noticed one very important factor. The more honest you are with yourself with respect to an analysis of your own abilities, disposable cash, and overall goals, the more likely you are to build a satisfying layout. This seems like a "duh" point at first but, having now seen the results of the planning and execution of several layouts - and getting the back-story of a few more layouts during operating sessions, a definite pattern is emerging.

Those people who ignored finances (I never have enough money for gas, but I'll need 33 extremely rare brass locomotives for this plan to work) skill level (despite the fact I can't tie my own shoes, I'm sure I'll be able to cut my own offset mitre gears for an N scale Climax one day) or goals (I'm a confirmed and grumpy loner but my design requires 7 to 9 tightly-knit operators to make the sessions work) have generally built layouts that make them unhappy to own and operate.

Notice I've used the qualifier "satisfying" instead of "good". A good layout is not necessarily one that receives critical acclaim for its clever use of materials or 100% adherence to prototype track arrangement, but it certainly is one that brings you joy to use and is not a unbearable burden on your time, a regrettable use of your space, or an onerous money-pit that can't be finished without depriving yourself of food & clothing.

almost, but not quite, entirely unlike success

The progress bar is at 99.9%. Legal eagles have taken their pound of flesh, inspections are acceptable, and the final few arrangements are made. Receipt of keys is pending, and that appears to be clear sailing at this point.

So far, so good. Only a few crashing breakers to spoil the otherwise feathery chop of waves.

Construction of a layout will not be the 1st priority, but it will be nice to be able to erect (and leave out) the S module set for repair and further additions to scenery and structures as time permits. It's always been a problem not having a protected space to work in while being here at the condo. The cats would have a field day with the field grasses, and I'd never see the scarecrow again...

5.03.2009

down to the wire

We're cutting it close. Things are happening on the home front but, as usual, not as quickly or smoothly as we'd like. The process of changing locales must have been deliberately made painful to discourage the average person from confusing civil servants with their whereabouts.

If everything works out according to plan there will be room for a workshop, a large garden, and our endlessly growing library of books. The kitchen is merely adequate as-is, and must be renovated to meet our future needs. If it all happens on time there will be barbeques and a garden party of some sort while the weather is still nice.

First steps will be familiarising ourselves with the perculiarities of the new house, getting used to new traffic patterns, and learning where all the local shops & markets are. A bit of painting & mending will see us through the summer & autumn.

The lot size is ample enough for even a garden railway venture should "planning permission" be given for such a folly. Proportion for native equipment would be 1:19.1 on 32mm gauge track, however, a dual gauge 32/45mm right-of-way would be built in order to accomodate visitors.

2.10.2009

servos you right

Duncan McRee has developed a DCC accessory decoder to enable R/C servos to control turnouts.



He is offering the schematics and source code free at the moment. I understand that pricing for pre-assembled units is to follow soon. The possibility to control other devices (turntables, signals, gates, etc.) is also present with code modification.

A short video of a beta unit in operation is available courtesy of the Model Railcast Show.

2.04.2009

iPodius

The Model Railcast Show is coming up on episode #50. Recent podcasts have covered benchwork construction and DCC topics.

The informal, ad-lib presentation style may not appeal to every taste but there is certain charm and spontaneity that you simply won't get with a script. Listening to the show often feels like you're just having a bunch of (knowledgable) guys over to your basement layout for a work session.

I have to applaud the primary host, Ryan, who is sticking his neophyte neck out every single show - letting everyone know he is not an expert model railroader. The honest (and sometimes basic) questions he asks his guests have forced me to re-think some of the things I "know" about the hobby and how to approach it. This has improved my understanding of areas I had taken for granted, and made me appreciate many aspects in different ways.

I find myself looking forward to each weekly installment. You do not need an iPod to listen to the programs; Quicktime, iTunes, or an mp3 player will do fine.

what?

There continues to be a lot of discussion about what it really means to be a model railroader. Frankly it's going mean a different thing to each person. It doesn't follow that any one approach or definition is going to be better or worse than any other.

One could argue that someone who only buys RTR is not really a model railroader. Unless, perhaps, their efforts are focused on modelling operations rather than equipment? You could also argue that someone who only builds models of equipment and doesn't have a layout to run them on isn't really a railroad modeller, just a model builder, right?

It really is too bad that so many people are spending so much time in specious arguments backed with dubious data. In the end, it's the person who isn't spending all of their time yakking it up in the discussion forums who is actually getting models built and running trains.

And that's what this whole exercise is supposed to be about, isn't it?

down time

Circumstance has temporarily dictated sedentary pursuits.

Having some time not otherwise occupied, I finally had a chance to hook up a LocoBuffer-USB from my PC to a Digitrax DB150 command station/booster. The free JMRI software allows you to program decoders, control the command station, operate virtual on-screen throttles, create CTC panels, and many other functions. Full details of hardware & OS support are on the website.

My main reason for implementing this software and hardware is to program decoders. I have one diesel, an S Helper Service SW9, with two decoders (Lenz Gold-JST & Soundtraxx DSD100LC-EH) which is a particular pain to program and keep track of the CV values. Hopefully I will be able to synchronise the sound & motion better using the graphical programming "DecoderPro" portion of the JMRI package.

I did notice that there is a mechanical problem with the diesel that I was unable to see or hear in the large auditorium of the last show. I will have to disassemble the loco to check out the issue. It seems that one of the pickup wipers is "clicking" during the wheel rotation.

1.08.2009

questions, questions everywhere, so let's just stop & think

There are a lot of questions flying around in discussion forums. Regular appearances are made by the likes of "What size turnouts should I use", "What colour should my fascia be", "How do I lay track", and "What rail code should I buy"? Reference Byron Henderson's slightly tongue-in-cheek post What sized t-shirt...?.

What can be considered very basic questions are asked for a variety of reasons. While some instances are a real search for answers they can also arise from pure laziness, the desire to pontificate, or even attempts at bushwhacking the self-proclaimed experts who populate all corners of the Internet.

A real tyro needs this basic information just to get started. Magazines like Model Railroader & Railroad Model Craftsman and 'getting started' books by Kalmbach & Carstens Publishing excel at presenting introductory material in an easy-to-digest, highly pictorial manner. The big trouble you run into on a typical forum is that one seemingly simple question will generate dozens of responses, often contradictory or even incomprehensible to a newbie. It's great if the inquirer can manage to sift through the resulting text to figure out what to do but it may leave them more confused and worse off than they started.

For many of these questions, the answer is going to be based on personal preference (what scale, what colour, what era) and no one (especially a stranger, even an expert one) will be able to tell you what your personal likes and dislikes are. The newbie will simply have to decide for his or herself. This will require personal effort in historical research, visits to clubs/layouts/real locations, watching videos, and simply reading books & magazines on the subject(s) coupled with some trial-and-error, hands-on work in order to get some idea of what's involved and how capable you are.

Once the initial hurdles of a) simply understanding model railroad specific terms and phrases, and b) learning about your own preferences are overcome, the newbie will be able to ask some informed questions and (hopefully) make better sense of the answers. Choice of an approach (freelance, prototype, protolance) and an honest evaluation of your own skills will shake out some of the remaining details (era, theme, turnout #'s, rail code, etc.)

The Internet has made it tremendously easy to cast a question out into a vast pool of knowledge but it useful to remember that, when fishing in a pool, you do not always hook into something you can digest. Don't rely on others to tell you what to do, or expect the "right" answers to arrive at the surface without getting your own feet wet.

11.25.2008

audio tracks

Some interesting material on the Model Railcast Show. Think of it as Model Railroad Radio. A number of episodes are available for on-demand listening.

They've had some great guests on for "Roundhouse" discussions regarding planning and design issues that are typical hurdles for modellers of all scales.

I was fortunate enough to be asked to speak about S Scale in show #40.

11.15.2008

lineside structure redux



The shed is complete enough to appear on the layout. As a concession to available modelling time, the tarpaper roof was simulated using 320 grit wet/dry sandpaper, cut grit side down with a guillotine. Gray dust is Bragdon Enterprises weathering powder.

Very glad I checked the paint scheme before painting; only the window sashes were Yellow, the window frames were #11 Green. Once the proper style of window has been obtained, I'll be able to add the sash details.

Possible & probable improvements/additions:
- correct 3-tab shingles
- oil tank & chimney (Scale Structure Ltd. p/n #2411 HO tank casting)
- replacement of side-sliding windows with proper, 6-pane style
- window glazing (microscope slide covers)
- sign board
- rain gutters/eave details
- a speeder to pose in front

I took some liberties with the construction; not having pictures of the structure in the timeframe being modelled forces me to fall back on both typical & assumed building methods of the era.

a tinkerer's tale

I am not a prolific modeller. I do not manage to complete a project a week. I tinker. I fiddle. I skip from task to task as thoughts prompt inquiry or shed some light on a hurdle to be overcome. Being surrounded by people who can produce large quantities of material on a regular basis can be daunting & intimidating. This is a constant source of irritation and distress, expecially when something really needs to get done.

Over on Mark Making Things, Mark talks about "Cheating Time" by breaking up a project into smaller and smaller discrete chunks that can be completed in very short time frames; a great approach to achievement.

Due to various space constraints (i.e. too much stuff, too little room), I cannot leave tools & projects out in the open. In-process work is therefore not readily available for short bursts of activity. If I find that I have 1/2 hour available, it may take that long to dig out what I need to proceed, only to find the sand in the glass has run out.

Think of the little (non-electronic, pre video game) puzzle composed of 16 spaces and 15 tiles. You shuffle the tiles around until a complete image or numeric sequence appears. Picture living in the one empty space, and having to shuffle all of the tiles (equipment, tools, projects) every time you want to do one little thing. It rapidly becomes easier to do nothing at all.



Activity is underway to correct the problem of space for the long term. Meanwhile, I have been gifted with sufficient room (and generous assistance) to put up my module set and work on it with an arranged schedule.

I always resort to to-do lists in order to codify what needs to be done, prioritise the sequence, and identify materials that need to be gathered. It can be a cumbersome method but, for those of us with atrocious time management, it can be enough to keep moving forward. Items are not listed with time estimates, simply the order in which they need to be completed. You slough along with whatever is current, until it is done.

That said, the MoW/speeder shed is nearing completion. Also, all the little paint touch ups on the module fascia, additional foliage, and the critical repair to the track alignment & elevation are done. Time before the next show may be running out, but the list of outstanding items is also diminishing at a gratifying rate.

"Why are you wasting precious time writing a Blog"? I hear you cry. Frankly, I find it helps to clarify my thoughts. It doesn't really matter if anyone else reads the content; it is available for my own review at any convenient Internet access point. It has always been meant as a journal or logbook rather than a publication. I can use it to remind me of things to do or methods to follow. In addition, it builds into a record of achievement which can be helpful when it feels like nothing has gotten done.

11.07.2008

to air is humane

I felt that the speeder shed needed better treatment than a brush-coat finish so I unpacked one of my old airbrushes (a Badger 350) and cabinet, fitted the coarse tip and had a go at it. One of the traditional complaints about airbrushing is the amount of prep and cleanup time & effort compared to the actual time spent painting. Using a single-action brush saves a lot of hassle and, unless you are doing very delicate weathering that requires minute paint flow control, is perfectly adequate for most hobby work.

The cabinet is made from a clear plastic, flip-top storage container which lies on its side. Furnace filter material is tacked over a frame in front of the extraction fan. The fan is an amazingly powerful, squirrel cage blower that came off a huge piece of stone-age computing equipment. The fan is attached to one end of the container where a circular hole is cut, and exhausts through flexible dryer vent tubing to a multi-flap dryer vent. The vent body is stuck through a piece of 1.5" thick extruded styrofoam sheet which is cut to snuggly fit the window opening. When the fan and compressor (Badger 280-1) are running it is bearably loud and there is absolutely no paint smell.



Badger ModelFlex CN Red #11 was used straight from the bottle. For future work I'll need to punch a larger hole in the top of a Badger #50-2016 "in-jar paint filter" as this version only fits the old, smaller diameter siphon tube. Having to strain the paint is a royal pain but it's a good way to keep the airbrush from clogging up as you work.

The shed trim and window frames will be painted Polly Scale ATSF Catwhisker Yellow, which is a near match to CN's off-white colour, prior to installation. This saves a lot of time-consuming masking and makes for a cleaner finish.

A separate base for the shed has been built and blended into the scenery on the module, along with a short stretch of code 55 trackage. The shed will be removable for protection between shows.

10.26.2008

domestic break

Just bought a nice, 15 light French door at the local "Re-Store" to use in one of the bedrooms of the condo. The door's surface has quite a lot of dent and scratch damage caused by mis-handling during salvage, but all of the glass is intact. Since the door will be painted, these cosmetic flaws are unimportant.

I was able, with the aid of a long metal straight edge and circular saw equipped with a planing blade, to cut 1/8" off each edge of the door to get it to fit into the existing door frame. This allowed for fresh dados to accomodate the hinges and kept everything nice and symmetrical. A quick trim of the top and bottom of the door completed the re-sizing.

The only major stumbling block is the height of the passage set. The position of the new door handle is lower than the existing door frame location. The door frames in the condo are one-piece metal assemblies. The strike plate location is fixed and cannot be moved up or down without a great amount of grinding, welding, and cursing.

The easiest solution is to raise the handle position in the door. Using a trepanning cutter in the drill press, I produced a number of pine slugs to fill in the existing holes. These have been glued and clamped into the body of the door, then shaved flush with a broad chisel. Using an appropriate hole saw and spade bit, I will re-drill the door at the new passage set location. Any remaining voids, dents, and scratches in the door will be filled with wood putty, sanded, and primed.

10.25.2008

a small lineside structure



This speeder/MoW shed is based on the one at Madoc, ON. I've added an extra window to the back wall of the "lunchroom/office" end to add a bit of visual interest as our modules are viewable from both sides. Siding is 6" wide scribed sheet that I found in a box of leftovers. Door and windows are Grandt Line castings (note the especially old black plastic door).

In the 50's the shed was heated by an oil stove so a suitable oval tank will need to be built outside the structure and a metal chimney will be poked through the roof. Later in life the shed lost the chimney (for unknown reasons) and the sides were covered in Insulbrick. Luckily, I'm modelling the 50's so I won't have to deal with the incredibly ugly appearance of Insulbrick siding.

10.20.2008

portly porter problem?

Dad purchased a Bachmann On30 porter (0-4-2) to use on his proposed 7mmNG, Welsh quarry inspired portable layout. From KeyKits in the UK, we obtained suitable Anglicising pieces (Wrightlines W996 cab kit and W963 chimney). The conversion itself was prompted by Brian Fayle's 7mm micro-layout workhorse and other examples from his website. The Bachmann chassis is a known "good runner" so we anticipate good service.

It did run well right out of the box, however, once the whitemetal cab pieces were substituted for the plastic details, the ends of the siderods started banging into the underside of the cab floor. "Too much weight!" was the initial thought but, upon partial disassembly, it was observed that one of the rear axle U-grooves in the plastic frame was deeper than the other. This caused the rear axle to tip out of true with respect to the front axle and the engine developed a list to one side.

This tilt caused the engineer's side of the cab floor to interfere with the siderod motion. ACC'ing a ~.015" thick pad of shim brass at the bearing surface of the over-deep U-groove solved the problem. Now the engine sits level on its axles and travels without any apparent binding.

The new cab assembly is secured to the stock footplate with flat head 1-72 machine screws countersunk into the underside of the floor. A stemwinder brake stand has been added to the footplate. The Bachmann steam dome needs to be removed from the saddle tank, and a simplified water fill hatch needs to be fabricated. The engine can then be painted and lined for service.

10.16.2008

more dip than a cocktail party

Well, not anymore. With judicious assistance, I finally managed to remove the pronounced dip at one end of the S scale module. Several possible approaches were considered before undertaking the work.
1) lever the extruded styrofoam "bedrock" up from below <- brute force and stupidity
2) hack into the structure sideways at the base of the ballast slope and jam in some shim material <- messy and imprecise
3) strip the rail off the affected area, stack new ties on top of the old, and carefully sand level. <- least destructive and easiest to verify results.

Ultimately choice #3 was pursued. About 2'4" of rail was removed and new sugar-pine ties were glued on with full strength Weld Bond adhesive to fill the depressed area. The opportunity was taken to re-align the rails slightly to eliminate a drunken wander in the main line. 50 grit paper was Super 77 spray adhered to one side of a 4" wide, 2' long, flat plank. 150 grit paper was likewise stuck to the other side of the plank.

The glue was allowed a long cure time before the ties were attacked with the 50 grit until nearly down to the original tie height at both ends. Sanding strokes were made perpendicular to the right-of-way to limit stress on the small gluing surface areas. Frequent checks were made to ensure that the new ties were not getting a crown or being tapered towards one side or the other. Once the old tie colour started to show through the thin skin left by the new ties at the extreme ends of the fill area the 150 grit side was used to clean up and de-fuzz the surfaces.



You can see how pronounced the dip was close to the module end by the rapid increase in fill-in tie thickness. Next the ties were stained with Floquil's "Tie Brown". What remains is the careful replacement of the rails to ensure they meet up with the previously marked positions at the end of the module, and the re-application of ballast around the new ties. A quick trip under the module with a soldering iron will re-attach the buss feeders, and re-testing will be done well in advance of the Christmas Train Show.

Why did the dip appear? Based on the sunken appearance of the ballast along the centreline of the ROW, I can only assume that the eye-dropper application of thinned adhesive was too agressive and the Tentest subroaded contracted as it dried up. This pulled the cork and ties downwards immediately after the end of the trapezoidal pine profile block at the end of the module (which remained flat & level).

Near the siding end of the split-rail fence, a copse of evergreens has sprung up. Short lengths of styrene tubing have been glued into the foam base to ensure rapid installation and removal of the trees for transport. There are twelve MountainView Depot conifers which are a far better looking and more consistently produced than anything I can manufacture.

Here's a product shot from the MountainView Depot gallery:



I'll need more of these, in various sizes, to add depth and texture to the rest of the module. In addition, a good number of flowering shrubs and low scrub will have to be applied to balance the scene.